- Type
- AI accelerator (data-centre GPU)
- Developed by
- NVIDIA
- Architecture
- Hopper
- Announced
- March 2022
- Memory
- 80 GB HBM3
- Successors
- H200, Blackwell (B200)
- Related
- NVIDIA, GPU Cluster, YTL AI Cloud
- Type
- AI accelerator (data-centre GPU)
- Developed by
- NVIDIA
- Architecture
- Hopper
- Announced
- March 2022
- Memory
- 80 GB HBM3
- Successors
- H200, Blackwell (B200)
- Related
- NVIDIA, GPU Cluster, YTL AI Cloud
Background
The H100 descends from a decades-long shift in which graphics processors, originally built for rendering images, became the engines of machine learning. NVIDIA's CUDA platform, introduced in 2006, allowed researchers to use GPUs for general computation, and the 2012 AlexNet breakthrough in image recognition demonstrated deep learning at scale. Successive data-centre generations — the V100 in 2017 and the A100 in 2020 — industrialised the approach, and demand for the H100 quickly outstripped supply after its launch.[1]
The chip combines 80 gigabytes of high-bandwidth HBM3 memory with roughly 3.3 terabytes per second of memory bandwidth, and includes a "Transformer Engine" that manages reduced-precision arithmetic for the transformer architectures behind modern language models. NVIDIA cited performance of up to around 30 times the previous generation for large-language-model workloads. H100s are sold in eight-chip DGX servers and larger SuperPOD clusters, and rented by the hour from cloud providers — chips, servers and clusters together forming much of the physical infrastructure of the AI industry.[1][2]
The AI boom and export controls
Through 2023 and 2024, technology companies built training clusters containing tens of thousands of H100s, and the chip's scarcity shaped strategy across the industry. The H100 also became a focus of United States export controls aimed at limiting China's access to advanced computing: October 2022 rules restricted A100 and H100-class exports, prompting NVIDIA to create reduced-bandwidth models for China, and October 2023 rules closed those loopholes. In January 2025 the outgoing US administration issued the "AI Diffusion" rule, which would have imposed country-level caps on advanced chip exports — affecting Malaysia and other data-centre hubs — before it was rescinded in May 2025 and replaced with case-by-case guidance and continuing concern about diversion to third countries.[3][4]
>See Also
Malaysia's chapter in the H100 story begins with the utilities-to-data-centres group YTL Power International, which announced a collaboration with NVIDIA in 2024 to deploy H100 Tensor Core GPUs at its Green Data Centre Park in Kulai, Johor — a 500 megawatt campus powered by an equivalent amount of on-site solar energy. The resulting YTL AI Cloud facility was declared operational in late 2025, among the first large-scale NVIDIA supercomputers in Southeast Asia, and is intended to host government and citizen AI services alongside commercial workloads.[2][5][6]
The deployment anchors a broader build-out: powered by the same generation of hardware, the Johor region has grown into one of Asia's fastest-growing data-centre clusters, with several gigawatts of capacity planned, and analysts have cited its concentration of capacity in debates in Washington over global chip access. For Malaysian researchers, startups and enterprises, H100-class compute is mainly accessible through cloud rental — from YTL AI Cloud and international providers operating in the region — and its availability is regularly cited as a factor in national AI ambitions, from sovereign models to university research.[4][5]
References
- ↑NVIDIA. (2022). NVIDIA H100 Tensor Core GPU. https://www.nvidia.com/en-us/data-center/h100/
- ↑YTL Power International. (2024). YTL to advance AI development in Malaysia in collaboration with NVIDIA. https://www.ytlpowerinternational.com/press-releases/ytl-to-advance-ai-development-in-malaysia-in-collaboration-with-nvidia/
- ↑US Bureau of Industry and Security. (2025). Department of Commerce announces rescission of Biden-era AI Diffusion Rule. https://www.bis.gov/press-release/department-commerce-announces-rescission-biden-era-artificial-intelligence-diffusion-rule-strengthens
- ↑SemiAnalysis. (2025). 2025 AI diffusion export controls. https://newsletter.semianalysis.com/p/2025-ai-diffusion-export-controls-microsoft-regulatory-capture-oracle-tears
- ↑w.media. (2025). YTL Power completes Nvidia-powered AI data centre in Johor. https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/